JunBo Dog Tie Out Cable and Stake Dog Long Lead and Stake for Outdoor Garden and Camping (5M White) - B07FT2QJZJ

  • Model: B07FT2QJZJ
  • 975 Units in Stock
Color:
    • JunBo Dog Tie Out Cable and Stake Dog Long Lead and Stake for Outdoor Garden and Camping (5M White) - B07FT2QJZJ
    • Motorsportandaccessories© DOG ANCHOR TIE DOWN STICK AND LEAD COMPLETE KIT - SAFELY SECURE YOUR DOG OR PET OUTSIDE AT HOME CAMPING OR CARAVAN - TOP QUALITY DOG ANCHOR - B073WHHDRJ
    • Prestige Super-Beast Dog Tie-Out 20-Feet - B0043EW6HY
    • Westminster Pet PRODUCTS Pet Expert 15' Heavyweight Tie-Out Cable for Dogs Variable Size - B01MV5D8KJ
    • Zinco Dog tie-Out Spiral Stake. 18 inch Long manually Screwed in The Ground Will Prevents Pulling Out and Bending. Comes with a 10 feet Double connectors Vinyl Coated Galvanized Cable. - B0748P134X
    • MPETS 10800199 Cable Attachment Strong Dog – Pack of 2 - B01M11I4OL

£70.31  £15.50
Save: 78% off

Add to Cart:

Please Choose:



JunBo Dog Tie Out Cable and Stake Dog Long Lead and Stake for Outdoor Garden and Camping (5M  White) - B07FT2QJZJ

  • The dog lead stake is made of high-quality carbon steel, and the surface is chrome-plated to increase the hardness. The bearing capacity is 661.4-881.8lb/300-400kg.

  • The spiral stake can be easily screwed into soil, girls with small strength can also be used, common ground is suitable, such as yard, grass, beach, etc.

  • The dog lead spike is adopted 360° rotatable ring design, which effectively avoids the leash twining on it.

  • Equipped with 16.4ft/5m and 32.8ft/10m dog leashes with a bearing capacity of 220.5- 330.7lb/100-150kg, suitable for use in your garden or various outdoor activities.

  • How to use, hold it at the handle, poke the dog stake uprightly into the ground and screw it clockwise into the soil.

  • Size Name:5M  |  Colour Name:White

    Information:
    Pets need exercise and walk outdoors like people.
    So you need a long and strong dog lead spike cable to keep your dog's range of activities and the safety of people around.
    Our tie out stake has a weatherproof chrome-plated coating to prevent rust, and easy to clean.

    Features:
    Material: carbon steel
    Color: white/blue
    Stake bearing capacity: 220.5lb-330.7lb/100kg-150kg
    Cable bearing capacity: 661.4lb-881.8lb/300kg-400kg

    Size:
    5M:
    stake: length 15.7''/40cm; diameter 0.3''/0.8cm
    cable: length 16.4ft/5m; diameter 0.2''/0.5cm
    Net weight (about): 20.1oz/570g

    10M:
    stake: length 15.7''/40cm; diameter 0.3''/0.8cm
    cable: length 32.8ft/10m; diameter 0.2''/0.5cm
    Net weight (about): 25.7oz/730g

    Package list:
    1 * tie out stake and cable set

    Notice:
    * The product dimension is manually measured, and there may be a 1-3cm error.
    * The head is sharper, please take it properly and keep it away from children.

    JunBo Dog Tie Out Cable and Stake Dog Long Lead and Stake for Outdoor Garden and Camping (5M White) - B07FT2QJZJ

    The product shows here is available with several styles, colors and sizes.
    Please leave us a message on the payment page if the option is not allow to choose.
    We will ship the product as your request.

    button-top.png